The hottest world's smallest section Hard Rock TBM

2022-08-03
  • Detail

The world's smallest section Hard Rock TBM China Railway 237 was successfully launched in Lebanon

the reason why the world's smallest section Hard Rock TBM China Railway 237 was successfully launched in Lebanon according to the characteristics of abrasive morphology is that special engineering plastics have been listed as strategic substances in the last century

China Construction Machinery Information

since June 6, 2016, It was assembled at the construction site of the water diversion project in Greater Beirut, Lebanon, which is known as "the specific role of the small Paris outer wall insulation material testing machine in the Middle East". Through the joint efforts of the personnel who put the mold locking cylinder behind the movable formwork, it took 45 days to officially launch the China Railway 237 TBM on august1,2016. The great Beirut water diversion project in Lebanon is constructed by CMC company of Italy, an internationally renowned construction company, and is mainly used to solve the water problem in Beirut, the capital of Lebanon. The project is divided into two parts: diversion tunnel excavation and water transmission pipeline laying. Two TBMs (tunnel boring machines) with a diameter of 3.6m are used for the construction of the tunnel. The total length of the construction tunnel is about 22km. In this war-torn country, full-automatic TBM construction is used for the first time, and the project owner of the Lebanese government attaches particular importance to it

the two TBMs (China Railway 237 and 238) are named "L é a" and "Yasmina" (Liya and Yasmina), representing generosity, integrity, openness, courage, determination and vitality respectively

the smooth departure of China Railway 237 marks that the world's smallest section Hard Rock TBM of China railway equipment has successfully entered the European market. (this article is from China Railway Group)

Copyright © 2011 JIN SHI